Position the main plank While using the tongue facet struggling with the wall. Push the tip seam of the second plank into your stop seam of the initial plank, then lock them collectively by laying the plank down. Proceed Functioning still left to proper. Ready to rework your space with https://www.trioflor.net/rigid-core-spc/